Sihai network

What procedures are needed for approval of rural construction land? Approval procedures of rural con

rural self built houses need land use license and urban construction planning license. So what procedures do rural construction land examination and approval need? Rural construction land approval process to understand.

Instructions for handling rural housing construction procedures:

I. procedure

(1) Householder's application (state the application reason, land area and land type, family status

Signature of village and community.

(2) Copy of household register and ID card of the head of household.

(3) There should be a construction land planning permit within the planning, and a village and a village should be handled outside the planning

Opinion on town planning and site selection.

(4) The original use certificate of collective land for construction.

(5) There is no specification of homestead in other places of the House Builder, which is signed by the village director and the cadres in the village.

One family can't have more houses.

(6) If there is no real estate in the separation, the original separation agreement shall be attached.

(7) To build a house beside the road, it is necessary to have a clear opinion from the road administration department.

(8) Where river courses are involved, clear opinions of water conservancy departments shall be provided.

(9) Opinions on the site of geological disaster survey.

(10) For the newly opened households, the applicant agrees to withdraw from the original residential land and hand in

A letter of commitment to the collective economic organization for the rearrangement of use (except for the original reconstruction).

(11) Only one house can be transferred for house sale, and the house can be transferred only after it is moved to another place and signed by the community or the town.

Note: it is strictly forbidden to occupy basic farmland.

2、 Approval area (determined according to local policies)

(1) 1-3 persons, approved by 3 persons, i.e. 90 square meters.

(2) 4 persons shall be approved by 4 persons, i.e. 120 square meters.

(3) Only 150 square meters can be approved for more than 5 people including 5 people.

(4) The same is true for those who withdraw their houses and start their houses. The expanded area is calculated together with the old house.

3、 Several batches

(1) The land boundary is not clear.

(2) If the land is disputed, it shall not be approved.

(3) No approval shall be given for geological landslide.

(4) No approval for the forbidden area.

(5) It is defined as no approval within the scope of basic farmland.

(6) Those in the planning area cannot be approved at will.

4、 Charging standard

(1) In case of immobility of the four boundaries, the rural residents who build houses or demolish houses shall not charge for the cost of production and apply for the land use license.

(2) If a house is to be reopened and a house is to be built on the newly occupied non cultivated land, no cost and deposit shall be charged, and a land use permit shall be obtained, but the old house must be demolished before it is reclaimed.

(3) For the newly occupied farmland (not paddy field or basic farmland), no cost and deposit will be charged if there is no house for the brothers, but the old house must be demolished and then ploughed again. Land occupation tax shall be charged according to regulations.

In addition, it is not allowed to approve the occupation, especially paddy field.

5、 Punishment for illegal land occupation

(1) The definition of building houses with illegal land occupation

Without approval, approval is obtained by fraud. Approval of Party A accounts for Party B, approval of less accounts for more, and approval of non farming.

(2) Procedures for imposing penalties

Case filing, investigation and evidence collection, on-the-spot measurement, investigation, study of punishment opinions, notification, issuance of punishment letters, collection of fines, and supplementary land use procedures.

(3) Treatment standard

1. Penalty of 10 yuan per square meter for non cultivated land.

2. For cultivated land (dry land), a fine of not less than 20 yuan per square meter shall be imposed, and the land occupation tax shall be collected accordingly.

3. For cultivated land (paddy field), a fine of not less than 30 yuan per square meter shall be imposed, and the land occupation tax shall be collected accordingly.

Note: (1) for some illegal building households, the attitude is bad and the influence is great, so the upper limit shall be imposed when the fine is collected, and the buildings (structures) shall be removed after the penalty.

(2) The basis of punishment for illegal building households is as follows:

In violation of Article 62 of the land administration law and Articles 32 and 69 of the regulations of Chongqing Municipality on land administration.

According to Article 76 of the land administration law and Article 42 of the regulations of the people's Republic of China on the implementation of Land Administration (order 256 of the State Council), a fine shall be levied.