How to inspect the hardbound room? Detailed process steps of hardbound room inspection

How to inspect the hardbound room? Detailed process steps of hardbound room inspection

4hw.com.cn: now many friends who don't need money will choose to buy hardbound houses. Compared with blank houses, it's easy and convenient. However, the hardbound houses should also be carefully inspected before moving in. If there are disputes in the future, how can the hardbound houses be inspected? Let's have a look.

1、 Make preparations

Hardbound house inspection is a hard work. You must make good preparations before you start, so that you can have a bottom in your heart. The house purchase contract must be provided, and the annexes to the contract, such as community distribution map and agreed rules, cannot be careless. In addition, the room type drawings with dimensions shall also be prepared before the house inspection. The room type drawings here refer to not only the layout plan of the house, but also the circuit and waterway drawings. In addition, the material confirmation form is also indispensable during acceptance.

2、 Check the house structure

The inspection of hardbound house needs to see whether the house structure is consistent with the contract. It is necessary to inspect the whole house, check the area, location and orientation, and measure the public area. Any error must be put forward before occupancy. If it is only a non structural problem, it can be truthfully recorded in writing during handover, and the real estate developer is required to make a written commitment to repair within a certain time limit.

3、 Check brand and quantity

During the acceptance of some fine decoration buildings, the owners found that the anti-theft doors, sanitary ware, decorative materials, lamps, overall cabinets, etc. were inconsistent with the brand agreed in the original contract. Therefore, it is suggested that the owners do not have to rush to accept the project quality of the construction project at the time of acceptance, but should first take some time to check the equipment problems, because the replacement of the equipment brand means the transformation of the residential quality.

4、 Inspection of doors and windows

Checking the doors and windows of the hardbound room is a key part of the acceptance of interior decoration. In addition to beauty, it is also very important to be practical. Pay attention to check whether the door frame veneer is parallel to the wall, the door leaf hinge shall be flexible and tight after closing. After the door is installed, you can pull the handle and shake it to detect. Windows made of aluminum alloy shall be installed firmly and correctly.

5、 Check water, electricity and coal

Check the waterways of the hardbound room, mainly to observe whether the water outlet of the faucet is normal and whether the sewer and floor drain are unobstructed. Check whether the water and floor drain are unobstructed. You can pour a basin of water down the channel and floor drain up to check whether the water flow rate is smooth and normal. In terms of circuit, because the deep lines are usually inside the wall, it is difficult for even professionals to judge, so the circuit inspection is generally solved by turning on the light and turning off the light and testing the socket. If you want to carry out accurate inspection, you need to use a megger. For pipeline gas, put the smoking paper roll near the alarm device to see whether the device is sensitive and whether the alarm sound and light prompt should close the intake solenoid valve. If not, it should be repaired in time.

6、 Detection air

During the inspection of the hardbound house, in addition to the various facilities in the house, it is also necessary to detect whether the air quality in the house meets the standard. If the air contains a large amount of toxic substances, it will certainly affect the health of the residents and affect their life. Therefore, the detection of air quality is a very important link in the acceptance of the house.

At present, the warranty period of residential decoration stipulated by the state is two years, and the warranty period of kitchen and bathroom waterproof project is five years. The owner shall carefully observe various quality problems of the house, negotiate with the developer or the property in time, and try to solve them within the warranty period.